• lennivelkant@discuss.tchncs.de
    link
    fedilink
    arrow-up
    14
    ·
    10 days ago

    Really, the metric we should be looking at is (f+a)/b where f is some subjective weighted measure of functionality, a of aesthetic value and b describes the bloat.