• 1 Post
  • 11 Comments
Joined 1 year ago
cake
Cake day: July 1st, 2023

help-circle


  • Getawombatupya@aussie.zonetoAsklemmy@lemmy.mldeleted
    link
    fedilink
    arrow-up
    6
    ·
    edit-2
    27 days ago

    We lost 2 months of local Windows servers in a smash and grab ransomware. we were lucky that our PROD servers were Linux. And this was a place with an active Windows 10 upgrade plan, gateways and air gapping for non-compliant systems. Our luck/planning was the backups system allow for two months of roll back to remove the malware. For the sysadmins, the character limit on the file paths meant we lost a bit of deep dive information 8/10 folders deep. (Over 64 characters or something like that.)








  • Countries with a lower PPP would get the lifetime cost closer to parity, if a handful of project experts etc are brought in at Western rates and local labour is used for the build and operation. If the federal system of government for that country streamlines the registration process while mandating key critical compliance steps (for instance, full test and verification on the containment system but not the light switch in the control room toilets, which I have read is an issue with the US regs) it would seem that non-us countries would be able to do nuclear cheaper per MWh.